Finish the surface of the wall as desired.
Pouring a concrete wall in sections.
Allow concrete to cure.
Once you have mixed the cement in the cement mixer dump it into the wheelbarrow.
Pour the retaining wall.
The layer thickness ranges from 300mm to 500mm and the time between successive layers should not exceed 30 minutes for normal weather condition and 20 minutes for hot weather condition.
Pour footings and wall.
Ready mix concrete trucks the big concrete trucks that deliver concrete and spin usually have a three yard minimum order.
Pouring of concrete in columns and walls if the height of these elements is large then it is recommended to place concrete in layers.
If the wall exceeds four feet in height footings should be poured separately.
In this situation people often go for u cart type concrete where you go to a provider who rents you a trailer with a yard of mixed and ready to pour concrete in it.
Pouring concrete in sections can also extend the life of your poured surfaces as the weight from a huge slab is not weighing in on the center of the piece like on huge slabs.
Pour in sections pour the concrete in small sections spreading the concrete by moving the chute back and forth and by having the driver pull forward as you go.
So that won t work for a slab this size.
The smaller areas allow for more control and the ability to take the pressure off the entire piece holding large amounts of weight once it has dried.
Follow the instructions on the bag of cement and mix accordingly.
Create contraction joints every 4 6 feet.