But if the air is warm and the concrete is below fifty then you could have a problem with the paint not bonding well.
Proper temperature to dry paint on concrete wall.
It should be at least 50 f when applying the paint and shouldn t drop below 32 f at night for.
Basement floor or wall.
One gallon of primer should be enough to cover 200 square feet of wall space.
However there are some things to consider when painting a concrete wall.
To paint concrete successfully so that it looks good and lasts a long time proper preparation is of paramount importance.
Let the paint dry for 1 2 days before stepping on or placing anything on the concrete.
Tape areas you do not want painted.
You can apply with a roller or brush or spray it on.
You may find that many paint labels recommend temperatures between 50 and 90 f but to ensure successful adhesion it s better to stay inside the extremes of this range because surface temperatures.
For an oil based paint the best temperature to apply is between 40 and 90 degrees fahrenheit.
Allow the primer to dry thoroughly.
Dry the final coat of paint for at least 24 hours before moving items onto or near the newly painted concrete to ensure a smooth professional appearance.
Even if it is 60 degrees during the day if the temperature dips below 50 degrees at night the paint structure can be compromised.
It may crack sooner than later if applied in too cold temperatures.
Apply a coat of primer to your walls which will help the paint adhere to the walls correctly.
Paint needs an environment of at least 50 degrees in order to dry properly.
Painting a concrete wall can spruce up an area or make it blend in with the rest of the area s décor.
You must choose the appropriate type of concrete paint determine if the wall is sealed from moisture and apply primer prior to painting the wall.
As for humidity levels the best drying will occur between 40 and 70 percent humidity.
If the material concrete is above fifty and the air gets cooler the only problem is the sheen might not look as good and it will dry slower meaning possibly several day before walking on it.
For latex based paints it s 50 to 85 degrees.