Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
Proper installation of roof drip edge.
The drip edge should be nailed centered in the top surface every 8 to 10 inches.
Align the leading bottom edge of the first piece on the gable rake with the front edge of the drip edge installed on the eave.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
Once free slide the drip edge out and discard.
How to install a drip edge.
Secure the drip edge with roofing cement.
You may need to nail through the starter strip into the drip edge.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
At the rake the drip edge is installed over the underlay.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
It can be done.
Be sure to tuck the drip edge under the starter strip and felt paper.
At the eaves the drip edge should be installed before the eave protection membrane.
The above figure shows the correct application of the drip edge.
If it doesn t pull the drip edge out slightly from under the shingles.
No cutting is needed for this piece.
Make sure the outer edge extends over the gutter.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Slightly open the hemmed edge to slide this piece over top of the installed piece on the eave.
Place a nail at one end then the other.